top of page

Adding Parts to an Extended Cab

Putting hydraulics on a 6700 extended cab


Front drive ready to be put on.
Cooler, pumps, and hydraulic tanks being installed.

Rear end ready for installment.

Cab being placed on.


Workheads have been installed.

All new wire and hoses installed and put on an extended Star Track 6700 tamper.
Jackbeams complete and put on.
bottom of page